+86-53188822466
All Categories
prefabricated steel structure bridge-0

Bridge

Home >  Products >  Bridge

Prefabricated Steel Structure Bridge

- Product Model: ASTM A36/ASTM A572GR50/EN S355JR/S355J2 Steel Structure
- Unit of Measurement: Ton
- Price Range: 1300—3000 USD/T.The specific price needs to be provided with drawings and calculated based on material requirements, processing requirements, paint requirements, etc. 
- MOQ: 100 Tons

  • Overview
  • Recommended Products

Description

 

Steel structure bridge is a bridge structure mainly made of steel as  the load-bearing material, prefabricated components through welding, bolts or riveting processes, and assembled on site. Its core features include factory prefabrication, high strength and lightweight, as well as fast assembly and other modern engineering characteristics. It is suitable for all bridge types such as beam bridges, arch bridges, cable-stayed bridges, suspension bridges, etc. It is an important bridge form that breaks through terrain limitations and achieves green construction.

 

5.webp6.jpg

 

Product Attributes

 

After-sales Service On site installation or installation guidance
Warranty Period 1 year
Transportation Packaging Container or bulk carrier transportation
Specification Based on actual project products
Brand Guoshun
Place of Origin Jinan
Standard European, American, and National Standards
Surface Treatment Spray painting or galvanizing

 

Trade Information

 

● Unit of Measurement: Ton

● Price Range: 1300—3000 USD/T.The specific price needs to be provided with drawings and calculated based on material requirements, processing requirements, paint requirements, etc. 

● Minimum Order Quantity (MOQ): 100 Tons

 

Advantages

 

1.High strength and lightweight

Q345qD/Q420qD specialized bridge steel is used, with a yield strength of over 420MPa, which reduces weight by 30% -50% compared to concrete structures and lowers foundation costs by 20%.

2.Rapid construction

Modular prefabrication (factory completion rate of 85%), on-site bolt connection, and single span 200 meter bridge erection cycle can be shortened to 7 days (traditional process requires 30 days), reducing traffic impact by 70%.

3.Ultra large span capability

The double width steel box girder structure achieves a pier free design with a main span of 300 meters, and the orthogonal steel bridge deck system has a bearing capacity of HL-93 standard (American standard), which is suitable for complex terrain requirements.

4.Excellent durability

Triple anti-corrosion system: hot spray aluminum (150 μ m)+epoxy mica iron (200 μ m)+fluorocarbon topcoat (50 μ m), with a lifespan of ≥ 50 years

Fatigue performance: No cracks after 2 million cycles of load (EN 1993-2 certification)

5.Intelligent monitoring integration

Pre embedded fiber optic sensors for real-time monitoring of stress/deformation, BIM+GIS digital twin platform for full lifecycle management, reducing operation and maintenance costs by 40%.

6.Green and low-carbon

The material recycling rate is 100%, and the carbon emissions are reduced by 60% compared to concrete bridges

Photovoltaic barrier system optional (annual power generation of 120kWh/m)

 

7.jpg8.jpg

 

Our Factory

 

 

原材存放Raw material storage.jpg材料下料Material cutting.jpg自动焊接Automatic Welding.jpg

Raw material storageMaterial cuttingAutomatic Welding

人工焊接Manual welding.jpg焊缝处理Weld seam treatment.jpg深加工Deep processing.jpg

Manual weldingWeld seam treatmentDeep processing

油漆 Painting.jpg包装Packaging.jpg发货Delivery.jpg

PaintingDeliveryPackaging

 

Get a Free Quote

Our representative will contact you soon.
Email
Mobile/WhatsApp
Name
Company Name
Message
0/1000

Copyright © 2025 by Shandong Guoshun Construction Group Co., Ltd.  -  Privacy policy