The gymnasium has a construction area of about 9,800 square meters. The main structure adopts non-standard welded box columns and welded H-shaped steel beams. It is the first high-standard sports stadium in the detonation area and a two-star prefabricated steel structure building. It uses prefabricated decoration to achieve pipeline separation.

Copyright © 2025 by Shandong Guoshun Construction Group Co., Ltd. - Privacy policy