With a construction area of 145,000 square meters, it is the largest two-star prefabricated steel structure complex in the Start-up Area. All structural components and parts are manufactured in-house using intelligent equipment, achieving standardized production and streamlined construction and installation. The shift from "on-site construction" to "factory manufacturing" not only reduces environmental and noise pollution at the construction site, but also, because there is no need for on-site concrete construction and curing cycles, reduces the construction period to just one-quarter to one-fifth of that of traditional buildings, significantly saving construction costs.