CONSTRUCTION FOR SIBITI BRIDGE OF TANZANIA

CONSTRUCTION FOR SIBITI BRIDGE OF TANZANIA
CONSTRUCTION FOR SIBITI BRIDGE OF TANZANIA
CONSTRUCTION FOR SIBITI BRIDGE OF TANZANIA

The steel bridge consists of two spans, a single span, and a single section, each with an expansion joint. Each span is 41 meters long, with a combined span of 82 meters, and a deck width of 8.1 meters. The entire steel structure was prefabricated in sections at the factory, utilizing CNC cutting and automated welding processes with an error tolerance of ≤ 2 mm, ensuring rapid on-site assembly.